Renewable Energy Innovation through a Micro-Hydro Power Plant (PLTMH) by the CSR Program of PLN Nusantara Power Up Paiton to Promote Energy Independence and Economic Development in Batur Village

Authors

  • Syifa Rizqi Amalia Community Development Officer PT PLN Nusantara Power UP Paiton, Indonesia
  • Javas Yola Bhagawanta Community Development Officer PT PLN Nusantara Power UP Paiton, Indonesia
  • Ibnu Magroho Officer Umum dan CSR PT PLN Nusantara Power UP Paiton, Indonesia
  • Aan Sugiantoro Kelompok PLTMH Tanah Merah, Indonesia
  • Salman Farisi Kelompok Tani Kopi Batur Pandan Wangi, Indonesia

DOI:

https://doi.org/10.54783/influencejournal.v8i3.391

Keywords:

Social Innovation, Corporate Social and Environmental Responsibility, Micro-Hydro Power Plant (PLTMH), Renewable Energy, Asset-Based Community Development.

Abstract

Electricity has become a primary necessity for society due to its crucial role in various aspects of life, making its availability essential. However, most electricity demand is still met through non-renewable energy sources. Therefore, innovation through the utilization of renewable energy is urgently needed. PT PLN Nusantara Power UP Paiton has introduced a community empowerment-based renewable energy initiative through its Tanggung Jawab Sosial Lingkungan (TJSL) program called ARUNA LESTARI, in Batur Village, Gading District, Probolinggo Regency. The program provides clean electricity to 334 residents in Neighborhood Units (RT) 8 and 9 of Tanah Merah Hamlet, who had been without access to electricity for many years. This study aims to examine the empowerment process comprehensively to understand the implementation of clean energy innovation at the community level and its role in improving the local economy through an asset-based community development approach. The research employed a descriptive qualitative method, with informants selected through purposive sampling. Data were collected through observation, interviews, and documentation involving PLTMH Group, Poktan Kopi Batur Pandan Wangi, and Kelompok Srikandi Batur. Data analysis was conducted through data reduction, data presentation, and conclusion drawing. The findings reveal that the ARUNA LESTARI Program, through the optimization of the PLTMH, has not only improved access to electricity for residents of Batur Village but has also served as a catalyst for the emergence of various productive economic activities based on local potential. Furthermore, the program has strengthened village assets and capital, particularly in the downstream development of local coffee products and the cultivation of laying hens.

References

Adelard, M. A., Aisyah, N., Setyana, L. D., & Ismail, A. A. (2026). Analisis downtime engine motor grader XCMG GR3005T PRO menggunakan metode Reliability Centered Maintenance II (RCM II) dan Failure Mode and Effect Analysis (FMEA). Jurnal Teknik dan Rekayasa, 3(1), 1-6. https://doi.org/10.22146/jtrab.v3i01.22225

Adhim, M. A., Rukmana, F. V. C., Setiawan, A. N., Zahra, A. M., Pasaribu, L. R. A., & Apriliani, F. (2025). Pengendalian mutu tahu dengan checksheet, diagram Pareto, dan diagram Fishbone pada usaha Tahu Tansa. Jupiter, 3(3), 93-104. https://doi.org/10.61132/jupiter.v3i3.861

Alfionita, S., & Alifin, F. I. (2023). Preventive maintenance analysis based on mean time between failure (MTBF) and mean time to repair (MTTR). Angkasa: Jurnal Ilmiah Bidang Teknologi, 15(2), 201-214.

Ali, M., & Arhami. (2021). Upaya meminimumkan biaya pemeliharaan mesin dengan metode preventive dan breakdown maintenance pada workshop Arita Steel Medan. JEMSI (Jurnal Ekonomi, Manajemen, dan Akuntansi), 7(2), 94-97. https://doi.org/10.35870/jemsi.v7i2.612

Anom, A. S., Lahay, I. H., & Uloli, H. (2025). Perancangan sistem produksi yang optimal untuk meningkatkan kapasitas produksi UMKM Flamboyan menggunakan metode lean manufaktur. Jurnal Teknik Industri Terintegrasi, 8(3), 3116-3129. https://doi.org/10.31004/jutin.v8i3.46335

Asraf, & Rasyidah. (2023). Manajemen pemeliharaan peralatan berbasis web. JITSI Jurnal Ilmiah Teknologi Sistem Informasi, 4(4), 162-170. https://doi.org/10.62527/jitsi.4.4.197

Bastari, A. S., & Varayesi, F. (2024). Analisis performance maintenance pada blowout preventer menggunakan metode reliability MTBF MTTR dan degradation test rubber packing element. Jurnal Teknologi Terapan, 2(1), 31-35. https://doi.org/10.47970/jttt.v2i1.628

Bilqis, et al. (2025). Penerapan metode seven tools terhadap pengendalian kualitas telur puyuh pada UMKM Arkan Quail Farm. Jurnal Manajemen dan Bisnis, 3(3), 68-84. https://doi.org/10.36490/jmdb.v3i3.1635

Firmansyah, I., & Sirait, G. (2025). Analisis productive maintenance pada mesin welding Polaris di PT. Excelitas Ikhsan. Jurnal Comasie, 12(03), 88-96. https://doi.org/10.33884/comasiejournal.v12i3.9800

Habeahan, B., Gea, V. H., & Margana, R. R. (2026). Analisis efektifitas penerapan preventive maintenance menggunakan Mean Time Between Failures dan Mean Time to Repair terhadap kinerja operasional forklift di PT XYZ. Jurnal Logistik dan Supply Chain, 4(02), 61-66. https://doi.org/10.33197/jlscc.v4i2.3401

Habibi, H. M., Sutrisno, & Jibril, A. (2025). Analisis perhitungan Mean Time Between Failure (MTBF) dan Mean Time to Repair (MTTR) mesin cold storage. Jurnal Cakrawala Ekonomi dan Keuangan Indonesia, 4(4), 1410-1421. https://doi.org/10.56799/jceki.v4i4.8857

Khalid, T., Ibrahim, H., & Dwi, Z. (2025). Analisis prediktif maintenance berbasis IoT untuk mengurangi downtime pada mesin produksi. Jurnal Ilmiah Ilmu dan Teknologi Rekayasa, 8(2), 63-67. https://doi.org/10.31962/jiitr.v8i2.398

Laksono, E. D. (2025). Analysis of Mean Time Between Failure (MTBF) on oil production machines. Jurnal Manajemen dan Sains, 5(04), 851-861. https://doi.org/10.58471/jms.v5i04

Novarika, W., Putri, C., & Suliawati. (2025). Analisis preventif maintenance pada forklift dan reach truck dengan metode menghitung Mean Time Between Failure (MTBF) dan Mean Time to Repair (MTTR) di PT Medan Distribusindo Raya. Jurnal Ilmiah Manajemen Ekonomi, 9(2), 117-128. https://doi.org/10.31289/jime.v9i2.16595

Pratama, M. H., & Paundra, F. (2024). Mean time between failure (MTBF) di PT. XXX. Prosiding Jurnal Sains dan Teknik, 4(2), 52-57. https://doi.org/10.54199/pjse.v4i2.292

Purba, A. S., Leksonowati, N. F. P., Pamungkas, N., Yuniarsih, N., Batubara, N. H., & Prasetyo, D. (2024). Studi pengaruh nilai availability mesin stamping terhadap jumlah hasil produksi. Jurnal Integrasi, 16(2), 98-103. https://doi.org/10.30871/ji.v16i2.8536

Putri, A. P. K., Ahmad, & Saryatmo, M. A. (2023). Analisis kinerja mesin percetakan dengan metode FMEA dan OEE pada divisi printing. Jurnal Metode dan Teknologi Industri, 2(2), 116-125. https://doi.org/10.24912/jmti.v2i2.26936

Rachmawan, E. D., Prasetyaningsih, E., & Amaranti, R. (2025). Reduksi downtime menggunakan preventive maintenance di PT XYZ. Jurnal Riset Teknik Industri, 5(1), 83-92. https://doi.org/10.29313/jrti.v5i1.6447

Ramadhan, I., & Fitriani, R. (2024). Optimalisasi efektivitas preventive maintenance berbasis usage-based maintenance untuk mengurangi downtime di PT PQR. Jurnal Integrated System, 7(2), 166-183. https://doi.org/10.28932/jis.v7i2.9760

Sandhu, M. A., Al Ameri, T. Z., & Wikström, K. (2019). Benchmarking the strategic roles of the project management office (PMO) when developing business ecosystems. Benchmarking, 26(2), 452-469. https://doi.org/10.1108/BIJ-03-2018-0058

Saputra, R. A., & Iriani. (2026). Implementation of MTTR and MTBF for determining the average maintenance interval of press machines at PT X. Jurnal Teknik Industri, 5(2). https://doi.org/10.31004/jutin.v8i3.46335

Saputri, E., Nurhidayah, C. A., Hardini, D. H. P., & Hartono, H. R. P. (2025). Analisis sistem perhitungan biaya produksi berdasarkan proses pada usaha manufaktur BCL Konveksi. Jurnal Ekonomi dan Bisnis, 18(12). https://doi.org/10.2324/g1b3kx22

Sihab, R., & Setiafindari, W. (2022). Manajemen pemeliharaan mesin spotwelding dengan menerapkan Total Productivity Maintenance di PT Indonesia Thai Summit Auto. Jurnal Ilmiah Teknik Mesin, Elektro dan Komputer, 2(3), 154-166. https://doi.org/10.51903/juritek.v2i3.423

Silvia, Suyatmmo, R. I. D., & Murnianti. (2023). Analisis preventive maintenance berdasarkan Mean Time Between Failure (MTBF) dan Mean Time to Repair (MTTR) pada alat blow molding di PT XYZ. Jurnal Penelitian Multidisiplin Bisnis dan Aplikasi, 2(8), 3471-3478. https://doi.org/10.59837/jpmba.v2i8.1495

Syaefudin, A., Santoso, D. T., Sumarjo, J., & Anjani, R. D. (2025). Analisis keandalan mesin menggunakan MTTR dan downtime untuk menentukan mesin kritis pada lini produksi PT X. Jurnal Mesin Nusantara, 8(2), 149-158. https://doi.org/10.29407/jmn.v8i2.2040

Winaryanti, M. P., Febriantina, S., Ikhwan, M., & Universitas Negeri Jakarta. (2025). Analisis manajemen pemeliharaan sarana dan prasarana kantor pada PT XYZ. Inovasi Manajemen dan Kewirausahaan, 6(3), 230-243.

Downloads

Published

05-09-2026

How to Cite

Amalia, S. R. ., Bhagawanta, J. Y. ., Magroho, I. ., Sugiantoro, A. ., & Farisi, S. . (2026). Renewable Energy Innovation through a Micro-Hydro Power Plant (PLTMH) by the CSR Program of PLN Nusantara Power Up Paiton to Promote Energy Independence and Economic Development in Batur Village . INFLUENCE: INTERNATIONAL JOURNAL OF SCIENCE REVIEW, 8(3), 276–287. https://doi.org/10.54783/influencejournal.v8i3.391